1920s villa raised for a new garage
Describe the brief, the condition you found the subfloor in, the method used, and the outcome the owner got.
- Location
- Suburb
- Scope
- Lift 2.4m, new ring foundation
- Duration
- 8 weeks
Home / Projects
Examples of the work — what the problem was, what we did, and what it took.
Placeholder case studies. The three below show the layout. Replace the text and drop in before/after photos — this page is usually the most-visited on a site like this, so real photos matter more than polished copy.
Describe the brief, the condition you found the subfloor in, the method used, and the outcome the owner got.
Describe the symptoms the owner noticed, what the level survey showed, and how the floor was staged back to level.
Describe the inspection findings, the compliance driver, and how the job was sequenced around tenants staying in place.
Foundation work is invisible once it's finished, which makes photography the hardest part of marketing it. A few things worth doing on every job:
We'll take levels across your floor, inspect the subfloor and give you a written report with honest options — whether that's a full lift, targeted re-levelling, or simply keeping an eye on it.